Ward Assignments
We need: artists, walkers, a driver, mechanics and seamstresses. Please contact your Ward Float Rep for more information.
Here are the Ward Assignments. Note that this is subject to change.
Amber Rose: Base decoration
Aurora Vista: Woman's body
Copper Oaks: Quilt
Crown Rose: Balls of yarn, cats and birds
Desert Sage: Flowers and fill
Grandview: Welding and signs
Mill Canyon: Upper base and rocking chair
Placid Rose: Cabin
Rose Point: Base paint on body and 3 sheep
Rose Summit: Tree and clothesline
Summit Ridge: Spinning wheel, bird decoration and paint
Yellow Sage: Quilt, sheep bodies, clothesline articles
All Wards: General decoration as needed.
We have been called to build a Days of 47 float; so that's what we'll do! We'll put our heads, our talents, our hands, and our faith, together and create something wonderful! Just you wait and see.
Friday, May 25, 2012
Framing Almost Complete
Our fearless leader, Bro. Bowen, has been busy every night this week welding the framework of our float together. It is almost done and watching the float take shape for the first time is very exciting! Here are some pictures of the float base. Note that the head on the float is an extra one we had and it is being used right now just to give us perspective.
Our fearless leader, Bro. Bowen, has been busy every night this week welding the framework of our float together. It is almost done and watching the float take shape for the first time is very exciting! Here are some pictures of the float base. Note that the head on the float is an extra one we had and it is being used right now just to give us perspective.
Sunday, May 20, 2012
Field Trip to Innovative Design Concepts (IDC)
On Thursday we took a field trip to the IDC warehouse and got some personal instructions in float building.
On Thursday we took a field trip to the IDC warehouse and got some personal instructions in float building.
There were several floats there already under construction. |
This huge dog was carved out of foam and then plastered. |
They answered all our questions. |
He taught us how to apply the burlap around the foundation of the float. |
We also learned how to glue the screening. I was assured that this glue would NOT give me cancer :) |
Saturday, May 5, 2012
Our Progressing Idea
As we've thought through the ideas, looked at the realities of building and the shape and size of our float base, and in talking to professional float builders, our idea has gone through several stages. (sorry about the low quality of these pictures)
Here is the newest artistic drawing:
Here are some earlier sketches:
As we've thought through the ideas, looked at the realities of building and the shape and size of our float base, and in talking to professional float builders, our idea has gone through several stages. (sorry about the low quality of these pictures)
Here is the newest artistic drawing:
Here are some earlier sketches:
Wednesday, May 2, 2012
This is a computer rendering of the general design of our float. |
We have the float base and we are ready to get started on the float. There will be a meeting this Saturday at 8am. Assignments will be given for the different components of the float and also go
over a schedule for the timeline of the actual build. Please look
at the pictures and come with ideas and suggestions on the actual
construction. Now that the weather is
starting to calm down a little, we'll
be able to start putting all the elements together to create a good
looking float that will express the pride we feel in our heritage.
Subscribe to:
Posts (Atom)